品牌
生产厂家厂商性质
北京市所在地
ZJC-150KV电压击穿测试机
一、应用范围:
First, the scope of application:
ZJC-150KV电压击穿测试机主要适用于固体绝缘材料如电线套管、树脂和胶、浸渍纤维制品、云母及其制品、塑料、薄膜复合制品、陶瓷和玻璃等介质在工频电压或直流电压下击穿强度和耐电压时间的测试;采用计算机控制,可对试验过程中的各种数据进行快速、准确的采集、处理,并可存取、显示、打印。
ZJC-150KV is mainly applicable to solid insulating materials such as wire tube, resin and rubber, impregnated fiber products, mica products, plastic film, and composite products, ceramic and glass medium in the frequency of the voltage or DC voltage breakdown strength and voltage withstand test time; using computer control, the various test data process the fast and accurate data acquisition, processing, and storage, display and print.
二、满足标准:
Two, meet the standard:
1、GB1408.1-2006《绝缘材料电气强度试验方法》
1, GB1408.1-2006 "electrical strength of insulating materials test method"
2、GB1408.2-2006《绝缘材料电气强度试验方法
2, "GB1408.2-2006 electrical strength of insulating materials test methods
第2部分:对应用直流电压试验的附加要求》
Part second: Additional requirements for tests using direct voltage "
3、GB/T1695-2005《硫化橡胶工频击穿电压强度和耐电压的测定方法》
3, GB/T1695-2005 "vulcanized rubber power frequency breakdown voltage strength and resistance to voltage measurement method"
4、GB/T3333 电缆纸工频电压击穿试验方法
4, GB/T3333 cable paper power frequency voltage breakdown test method
5、HG/T 3330绝缘漆漆膜击穿强度测定法
5, HG/T 3330 insulation paint film breakdown strength test method
6、GB12656 电容器纸工频电压击穿试验方法
6, GB12656 capacitor paper power frequency voltage breakdown test method
7、AST D149《固体电绝缘材料工业电源频率下的介电击穿电压和介电强度的试验方法》
7. D149 AST test method for dielectric breakdown voltage and dielectric strength of solid electrical insulating material industrial power frequency
三、主要技术指标:
Three, the main technical indicators:
1、输入电压 AC220V 50Hz
1, the input voltage AC220V 50Hz
2、输出电压: AC:0~150kV; DC:0~150kV
2, output voltage: AC:0 DC:0 ~ 150kV ~ 150kV;
3、输出功率: 15kVA
3, output power: 15kVA
4、测量范围: AC15~150kV; DC15~150kV
4, measuring range: AC15 DC15 ~ 150kV ~ 150kV;
5、测量误差: ≤ 2%
5, measurement error: = 2%
6、升压速率: 1kV/s~5kV/s
6, pressure rate: 1kV/s ~ 5kV/s
7、耐压时间: 0~4H
7, pressure time: 0 ~ 4H
8、漏电流 1~30 mA可由计算机软件自由进行设定
8, the leakage current 1 ~ 30 mA can be set free by computer software
9、电源 交流220V±10%的单相交流电压和50Hz±1%的频率
9, the power AC 220V + 10% single-phase AC voltage and frequency of 50Hz + 1%
10、试验环境温度: 15 ~ 30℃,相对湿度:0~85%能够稳定运行。
10, the test environment temperature: 15 ~ 30 degrees, relative humidity: 0 ~ 85% can be stable operation.
11、外形尺寸长×宽×高:1980mm×1220 mm×1750mm(参考)
11, appearance size length * width * height: 1980mm * 1220 mm * 1750mm (Reference)
12、设备自重: 350Kg(参考)
12, equipment weight: 350Kg (Reference)
13、接地要求仪器需要单独接地,接地附合国家标准要求,金属棒深埋地下至少要1.5米以下
13, grounding requirements instruments need to be grounded alone, grounding with the national standard requirements, the metal rod buried at least 1.5 meters below the depth
四、结构原理及性能特点:
Four, structural principle and performance characteristics:
1、主要由:升压系统(高压变压器)、测量系统、A/D转换器、放电系统、电极、油箱、电极定位架、计算机数据处理系统、软件等组成;
1, mainly by: boost system (high voltage transformer), measurement system, A/D converter, discharge system, electrode, fuel tank, electrode positioning frame, computer data processing system, software and so on;
2、计算机---A/D转换器---测量控制系统---调压装置----升压变压器-----试样;
2, the computer ---A/D converter --- measuring control system --- voltage regulator -- the test sample;
3、高压变压器主要产生试样所需的直流电压;
3, high voltage transformers are mainly generated by the DC voltage of the sample;
4、调压器用于调节升压变压器输入端电压以产生高压所需的输入电压;
4, the regulator is used to adjust the input voltage of the boost transformer to generate the required input voltage;
5、电压测量主要是从高压变压器测量端测量,高压变压器测量端和高压端是线性的;
5, voltage measurement is mainly from the measurement of high voltage transformer measurement, high voltage transformer measurement and high pressure side is linear;
6、放电系统在试验做完以后放电,以免产生放电对人身的危害;
6, discharge system in the experiment after the discharge, so as to avoid discharge on the human body harm;
五、计算机系统及软件包
Five, computer systems and software package
1、试验软件是我公司研发的功能强大、操作简单、显示直观的试验软件系统。
1, the test software is my company's latest research and development of powerful, easy to operate, display intuitive test software system.
2、采用计算机控制通过人机对话方式,完成对绝缘介质工频电压击穿,工频耐压试验。
2, the use of computer control through the man-machine dialogue, the completion of the insulation dielectric power frequency voltage breakdown, power frequency withstand voltage test.
3、试验过程中可动态绘制出试验曲线,试验的曲线可以多种颜色叠加对比,局部放大,曲线上任意一段可进行区域放大分析;
3, the test process can be dynamically drawn out of the test curve, the curve can be a variety of color overlay contrast, local amplification, curve on any section of the region can be amplified analysis;
4、可对试验数据进行编辑修改,灵活适用;
4, the test data can be edited and modified, flexible;
5、试验条件及测试结果等数据可自动存储;
5, test conditions and test results and other data can be stored automatically;
6、试验报告格式灵活可变,适用于不同用户的不同需求;
6, test report format flexible, applicable to different needs of different users;
7、可对一组试验中曲线数据的有效与否进行人为选定;
7, can be used for a group of test data in the curve of the effective or not artificially selected;
8、试验结果数据可导入EXECL,WORD文档编辑;
8, the results of the test data can be imported into WORD, EXECL document editing;
9、软件设备人员管理功能,试验人员可设置自己的试验项目和试验参数,设置自己的试验内容后别人无法进入程序;
9, software equipment personnel management function, test personnel can set up their own test items and test parameters, set up their own test content after others can not enter the program;
10、过电流保护装置有足够的灵敏度,能够保证试样击穿时在0.1S内切断电源;
10, over current protection device with sufficient sensitivity, to ensure that the sample breakdown in the 0.1S cut off the power supply;
11、仪器运行的持久性: 仪器可连续运行使用,不需为保护仪器而定期停机。
11, the persistence of the operation of the instrument: the instrument can be used continuously, without the need for the protection of equipment and regular downtime.
六、安全说明:
Six, safety instructions:
1、设备要安装单独的保护地线。接保护地线,主要是减少试样击穿时对周围产生的较强的电磁干扰。也可避免控制计算机失控。
1, equipment to install a separate protective ground. The protective earth wire is mainly to reduce the strong electromagnetic interference generated by the breakdown of the sample. Can also avoid the control of computer control.
2、直流试验放电报警功能:在设备做完直流试验时,当开启试验门时设备会自动报警,直至使用设备上的放电装置放电后报警会自动取消。
2, DC test discharge alarm function: in the device to complete the DC test, when the opening test door equipment will automatically alarm, until the use of equipment on the discharge device discharge alarm will automatically cancel.
3、试验放电装置,随主机为一体化,改进了以往单独配备一根放电杆的功能。
3, test discharge device, with the host for the integration, improved in the past with separate a discharge pole function.
4、该试验设备的电路设有多项保护措施,主要有:过流保护、失压保护、漏电保护、短路保护、直流试验放电报警等。
4, the circuit of the test equipment is equipped with a number of protective measures, mainly include: over current protection, voltage loss protection, leakage protection, short-circuit protection, DC test discharge alarm, etc..
5、安全保护:
5, safety protection:
(1)门限位保护:不关门,即使通电点实验开始,设备无任何反应,软件有:安全门未关闭提示。
(1) threshold protection: not to close the door, even though the power point of the experiment, the device has no response, the software is: the security door is not closed tips.
(2)电压归零保护:如果在实验过程中,突然断电,下次开机后,会自动回到零位,保证初始电压为在零位
(2) zero voltage protection: if in the experimental process, suddenly power off, the next boot, will automatically return to zero, to ensure that the initial voltage is zero.
(3)终止电压保护:可以通过软件设定终止电压,保证在升压过程中如果出现异常升到的电压后,自动终止并归零
(3) termination voltage protection: the software can be set to terminate the voltage, to ensure that in the process of boosting if the abnormal rise to the specified voltage, the automatic termination and return to zero
(4)高压机械限位:如果软件系统失去控制,电压继续往上升,到高压限位后自动归零如果在击穿后未判停,通过过流保护器采集数据保证电压自动归零有高压指示灯,通过观察指示灯的状态来判断实在升压还是在零位如果长时间做实验,为保证设备的良好运行,设备留有变压器排气口,保
(4) high pressure mechanical limit: if you lose control of the software system, the voltage to continue to rise, to the high pressure limit after auto zero if not to stop in after the breakdown of the overcurrent protection device to ensure the voltage data acquisition automatic zero pressure indicator, by observing the indicator of the state to determine the real boost or in zero if long time to do the experiment, in order to ensure a good operation of equipment, equipment have transformer outlet.
七、 主要配置:
Seven, the main configuration:
1、主机 1台
1, the host 1 Taiwan
2、升压装置 1套
1 sets of 2, booster
3、放电装置 1套
1 sets of 3, discharge device
4、测量系统 1套
4, 1 sets of measurement system
5、电压调节装置 1套
5, 1 sets of voltage regulator
6、数据处理系统 1套
6, the data processing system 1 sets
7、计算机 1台
7, the computer 1 Taiwan
8、打印机 1台
8, printer 1 Taiwan
9、A/D转换器 1个
9, A/D converter 1
10、控制软件 1套
10, control software 1 sets
11、试验电极 1套
1 sets of 11, the test electrode
12、放电棒 1只
12, rod 1
13、油箱 1个
13, the tank 1
14、试验台 1个
14 test 1
15、安全防护系统 1套
15, 1 sets of safety protection system